# Production Part Approval Process (PPAP)
## When to use
Use this skill when:
- A supplier must submit parts for customer approval before Start of Production (SOP)
- A design change, process change, or engineering change requires re-submission
- An OEM or Tier 1 customer requests a PPAP at a specific level
- Reviewing or auditing an incoming PPAP package from a supplier
- Determining what PPAP level is required for a given change
## Prerequisites
- Part number, revision level, and customer drawing
- Bill of Materials (BOM) if applicable
- Production process flow and manufacturing location confirmed
- Customer's PPAP level requirement (Level 1–5) or change category known
## Workflow
### Step 1 — Determine the PPAP Level
| Level | What must be submitted |
|-------|----------------------|
| 1 | Part Submission Warrant (PSW) only — no supporting documents unless requested |
| 2 | PSW + designated samples + limited supporting data |
| 3 | PSW + product samples + complete supporting data (default for new parts) |
| 4 | PSW + other requirements as defined by the customer |
| 5 | PSW + parts and complete supporting data — reviewed at the supplier's manufacturing location |
**Default:** Level 3 for new parts or significant changes. Always confirm with the customer before submitting.
### Step 2 — Identify the change category
PPAP re-submission is required for:
- New part or product
- Engineering change (design revision)
- Change of supplier (sub-supplier, raw material)
- Chan