apqp
SolidAdvanced Product Quality Planning (APQP) — plan and track a new product launch through all 5 phases, identify deliverables per phase, run gate reviews, and ensure quality outputs are complete before Start of Production (SOP). Use when launching a new part, managing an APQP project, or auditing APQP completeness. Covers AIAG APQP 2nd edition and IATF 16949 §8.3.
Install
Quality Score: 78/100
Skill Content
Details
- Author
- RBraga01
- Repository
- RBraga01/Quality-Engineering-Skills
- Created
- 1 months ago
- Last Updated
- today
- Language
- JavaScript
- License
- MIT
Similar Skills
Semantically similar based on skill content — not just same category
ppap
Production Part Approval Process (PPAP) — verify PPAP submission level, audit all 18 elements, check completeness for customer approval, prepare PSW. Use when a supplier needs to submit parts for approval, when reviewing a PPAP package, or when determining which PPAP level is required. Covers AIAG PPAP 4th edition with Ford, BMW, VW, and Stellantis OEM-specific requirements.
control-plan
Control Plan — build, review, or audit a Prototype, Pre-launch, or Production Control Plan linked to PFMEA failure modes and controls. Use when creating a new control plan, updating after a process change or corrective action, or auditing an existing CP for completeness and PFMEA alignment. Covers AIAG Control Plan reference manual and IATF 16949 §8.5.1.
project-manager
Orchestrate AI Coding OS phases, document gates, work items, and delivery handoffs.