← ClaudeAtlas

switch-costlisted

Checks what breaks before you leave a tool: what exports and in what format, what is lost outright, and what the move actually costs in hours. Trigger when the user says "what happens if I leave this tool", "what breaks if I switch", "should I switch from X to Y", "how locked in am I", "can I get my data out of", "before I cancel", "before I migrate off", or names two tools and asks about moving between them. Also trigger when a stack-audit verdict of cancel, or a before-you-install decision between two tools, needs the actual exit cost checked before anyone acts on it. Ends on a verdict: low switching cost, switching cost with conditions, or high switching cost, naming what makes it so. Use before-you-install for a tool not yet adopted, and stack-audit to decide whether a tool should be cancelled in the first place; this one is for what happens after that decision, on the way out.
theAnirudhKumar/work-design · ★ 0 · AI & Automation · score 70
Install: claude install-skill theAnirudhKumar/work-design
# Switch Cost The decision to leave a tool gets made on the reasons to leave. The cost of actually leaving shows up afterward, when the export turns out to be a PDF nobody can reuse, or the integration nobody remembers building stops firing silently. The failure this exists to prevent: **finding out what you lose on the way out, after you have already committed to leaving.** Not whether to leave. What leaving actually costs, named before the decision is final rather than discovered during the move. --- ## What this needs **Minimum: the tool's name.** Nothing else. It will tell you what to go and check, and mark every gap it could not fill. **Better with** what is actually stored in it: content, configuration, integrations, history, other people's access. A general answer about a category of tool is not the same as an answer about this one, in this state. **Best with** the destination named. Switching cost is not a property of the tool being left; it is a property of the gap between the tool being left and the tool being moved to. "What breaks if I leave Notion" is a weaker question than "what breaks if I move from Notion to Obsidian," and the second is the one with a real answer. ### Two modes, and say which one you ran **Researched mode.** Web access is available. Check the tool's actual export documentation, its stated data-retention policy after cancellation, and its contract or terms for notice periods and minimum terms. **Guided mode.** No web access. Hand over