abc-xyz-segmentationlisted
Install: claude install-skill gulmezeren2-byte/industrial-engineering-ai-skills
# ABC-XYZ Segmentation
Value tells you where the money is. Variability tells you whether forecasting, buffering or restructuring can work. Never output a classification without the policy consequences.
## Required data
Per-SKU demand history (`sku`, `period`, `qty`) covering 12+ periods, plus unit value (`unit_price` or cost). Without unit value, ABC degrades to a volume ranking - say so and ask for prices before presenting conclusions about money.
## Workflow
1. **ABC on annual value.** Rank by annual consumption value; cumulative 80% = A, next 15% = B, rest = C. Report the actual concentration found (e.g. "15 SKUs = 80%"), not the folklore 20/80.
2. **XYZ on variability.** CV = std/mean of period demand per SKU. Defaults: X < 0.5, Y 0.5-1.0, Z >= 1.0. These are conventions - check the CV histogram for natural breaks and state the thresholds used. SKUs with structural zero periods (intermittent) belong in Z regardless of CV arithmetic; mean-based CV understates their risk.
3. **Build the 9-box** with SKU counts AND value share per cell. Value share is what makes managers act.
4. **Attach the policy per cell** (adapt wording to context):
- A-X: tight forecasting pays; low buffer, frequent review, automate replenishment
- A-Y: forecast + healthy buffer; investigate variability drivers
- A-Z: do not chase forecasts - strategic buffer, lead-time negotiation, or make-to-order
- B-X / C-X: min-max autopilot; withdraw planner attention
- B-Z: buffer or longer pr