evidence-groundinglisted
Install: claude install-skill gtrabanco/agentic-workflow
# Evidence Grounding (internal)
One shared owner of the evidence discipline that every authoring skill uses
before it asks for an independent review. It prepares and checks; **it never
reviews and can never emit a review PASS**.
## When to use
- `design-feature` — while writing or upserting a Product half.
- `plan-feature` / `plan-feature-scaffold` — while filling the Engineering half
and cutting phases.
- `plan-fix` — while drafting a fix SPEC and its phases.
- Nothing else. A reviewer does not load this skill: its readiness verdicts are
authoring-quality gates, not review verdicts. The shared review cycle and the
planning-ledger shapes belong to `pre-execution-review`; the plan-stage row of
the evidence table is restated here only as a pointer.
## Hard rule — authority boundary
This skill may emit only these two vocabularies, and only at the step that owns
them:
| Emitted by | Closed outcomes |
|---|---|
| a grounding pass (§Ordered passes, step 2) | `CONTEXT-PREPARED \| NEEDS-EVIDENCE \| NEEDS-DESIGN` |
| a readiness preflight (§Ordered passes, step 5) | `READY-FOR-REVIEW \| NEEDS-EVIDENCE \| NEEDS-DESIGN \| NEEDS-REPLAN` |
`SPEC-REVIEW-PASS`, `PLAN-REVIEW-PASS` and any `*_REVIEW-PASS` string are
**forbidden outputs here** — they belong to `review-spec` / `review-plan`
running in a context that did not author the artifact. A same-context readiness
`READY-FOR-REVIEW` is a statement that the artifact is *shaped* for review; it
is not approval and must never be