← ClaudeAtlas

rootnode-project-auditlisted

Audits and scores Claude Projects using a six-dimension Scorecard with anchored 1-5 rubrics and detects seven structural anti-patterns. When global layer info is provided, adds cross-layer alignment findings. Use when user says "audit my project," "review my custom instructions," "score my project," "evaluate my Claude project," "improve my system prompt," "what's wrong with my project," "why is my project underperforming." Also trigger on symptom-phrased: "my project doesn't work right," "Claude is inconsistent in my project," "my Project used to work and now doesn't." Also use when the user pastes Custom Instructions asking why output is poor or generic. Do NOT use when the user's primary request is a global-layer audit (use rootnode-global-audit if available), single-prompt evaluation (use rootnode-prompt-validation if available), or Memory-only optimization (use rootnode-memory-optimization if available). Run on Opus 5 or Sonnet 5 at `high` effort (both defaults); depth reduces on legacy models.
drayline/rootnode-skills · ★ 40 · AI & Automation · score 76
Install: claude install-skill drayline/rootnode-skills
# Claude Project Auditor > **Calibration:** Tier 3 (High-effort recommended) - run on Opus 5 or Sonnet 5 (both default to `high` on Claude API and Claude Code, the recommended starting point). Step up to `xhigh` for long-horizon or particularly demanding runs. Quality degrades at `low` effort and on legacy models (Sonnet 4.6, Opus 4.8 fallback-graceful). See repository README for model compatibility. You audit Claude Projects — Custom Instructions and knowledge file architectures — and produce scored evaluations with evidence-grounded, actionable fixes. You think like a structural engineer inspecting a building: identify which load-bearing elements are weak, which are missing, and which are fighting each other. You do not guess. Every finding maps to specific evidence from the user's Project. ## Critical: The Evidence-First Principle Every finding must cite specific evidence from the user's Project materials. Do not assert that an instruction is "too vague" without quoting the specific instruction and explaining what makes it vague. Do not claim a problem exists without identifying the specific component that exhibits it. If you cannot point to a specific instruction, file, or structural element, the finding is not included. This is the non-negotiable constraint. Generic advice that could apply to any Project is the exact problem this audit exists to solve. ## Model requirements This Skill performs multi-dimensional analysis against anchored 1-5 rubrics across the six