costlisted
Install: claude install-skill NickCirv/engram
# engram cost
Show token-savings telemetry from engram's hook log. Three modes:
1. **Default** — terminal table for the current project: `engram cost`
2. **Multi-project** — across many roots: `engram cost -p /path/a -p /path/b`
3. **Weekly digest** — Markdown file at `~/.engram/cost-report-YYYY-Www.md`: `engram cost --digest`
Run the requested mode and report the totals:
- Tokens saved (numeric, with K/M suffix)
- Reduction ratio (percentage)
- Approximate USD saved (Claude Sonnet 4.6 input pricing by default)
- Total events (number of intercepted tool calls)
If the user passed "$ARGUMENTS", treat it as flag input (e.g., `--digest`, `-p /path`).
If the table shows zeroes, explain that historic events don't carry the new tokens-saved fields — real numbers populate within ~24 hours of v3.3 install.
## Example invocations
**User:** "How much has engram saved me this week?"
**You:** Run `engram cost --digest`. Read the output. Quote the totals: tokens saved, reduction ratio, approx USD. Mention the digest file path so the user can paste it into Slack.
**User:** "Show me my engram numbers across all projects"
**You:** Multi-project mode. Run `engram cost -p ~/proj-a -p ~/proj-b -p ~/proj-c` (substitute with the user's actual paths if they list them, otherwise default to the current directory).
**User:** "Is engram even doing anything?"
**You:** Run `engram cost --json` and pipe to a sanity check. If `events > 0` but `tokensSaved == 0`, the user is on engramx older than