← ClaudeAtlas

im-stucklisted

Break the task out of a loop, confusion state, or false-progress state, and determine the fastest safe path forward. Diagnoses whether the issue is technical, workflow-related, or scope-related, then routes to the right recovery command and editor mode (Ask by default; Debug if the stuckness is a concrete technical failure; Plan if it is a phase or contract or sequence issue). Use when progress is looping or stalling, the same questions or reviews are being repeated, the wrong command or wrong editor mode may be in use, or when the user is unsure whether the problem is technical, workflow-related, or scope-related. Do not use when the next step is already clear, the task only needs normal routing via what-next, or when the task is brand-new and should start with task-init. When the real blocker is a vague prompt, use prompt-shape.
Mozurok/fhorja.dev · ★ 6 · Code & Development · score 79
Install: claude install-skill Mozurok/fhorja.dev
Act as a senior/staff engineering workflow recovery lead for the active engineering task. Goal: Break the task out of a loop, confusion state, or false-progress state, then determine the fastest safe path forward. Mandatory context bootstrap (before any output): <!-- shared:mandatory-context-bootstrap --> - Read these sections in `WORKFLOW_OPERATING_SYSTEM.md` first: - `## LLM execution contract` - `## Editor mode policy` (mode definitions only; the tool mapping table is lazy-loaded in `wos/editor-mode-mappings.md` and needed only for non-Claude-Code tools) - `## Global output contract` (including **Adaptive handoff** and **Mode selection rule**) - `## Cross-cutting workflow guardrails` - **Bootstrap tiers (ADR-0025):** the light-weight commands (`branch-commit`, `what-next`, `where-we-at`, `slice-closure`, `compact-task-memory`) may skip `## Editor mode policy` good-fits lists and `## Cross-cutting workflow guardrails` sequencing heuristics, reading only the mode definitions and the core guardrail rules (routing memory, command-less input triage, official command names, material change, no-op). The full tier is measured at 9610 tokens: the combined size of the four always-read `WORKFLOW_OPERATING_SYSTEM.md` sections listed above. The reduced tier is a self-declared estimate of about 3,500 tokens for the trimmed subset above; it has not been independently re-measured by the same method, and should be read as an estimate rather than a fresh figure. The same reduced t